Survey graphic – c.1993
Carpenter's tool belt – c.1993
Stay cable abstract – c.1995
Reinforcing steel and formwork on western approach – c.1993
Worker with plank and crane tracks – c.1993
Carpenters prefabricating formwork – c.1993
A load of reinforcing steel arriving on site – c.1993
Steelfixer inside base of western tower – c.1993
Jumpform screw jacks on tower leg – c.1993
Leading hand carpenter's tool belt – c.1993
Laurie Chow, RTA construction engineer – c.1993
Bruce Wilson, project engineer, and Simon Lillyman, administration manager – c.1993
Merv Francis, Scott Wyatt and Mario Perkovic adjust chains for lift of precast concrete panel – c.1993
Merv Francis, Scott Wyatt and Mario Perkovic adjust chains for lift of precast concrete panel 2 – c.1993
Merv Francis, Scott Wyatt and Mario Perkovic adjust chains for lift of precast concrete panel 3 – c.1993
Merv Francis, Scott Wyatt and Mario Perkovic adjust chains for lift of precast concrete panel 4 – c.1993
Placing precast panel in western abutment retaining wall – c.1993
Western tower and Sydney Harbour Bridge from Glebe – c.1993
Work on western deck stay cable guide pipe – c.1993
Work on western deck stay cable guide pipe 2 – c.1993
Tony Figueredo carring scaffold pipe over reinforcing steel on western approach span – c.1993
Crane driver Joe Stelzer at controls of 4100 Ringer Mantowoc crane – c.1993
Dani Te-Nah-U on section of Kingshore support scaffolding – c.1993
Placing hooks for slinging of Kingshore towers ready for erection – c.1993
Erecting first section of Kingshore scaffolding under western tower – c.1993
Jumpforms on western tower – c.1993
Western tower with Johnstons and Blackwattle Bays and city backdrop – c.1993
Ivan Carapina, construction worker – c.1993
Alan Breslin, steelfixer – c.1993
Bill Tams, boilermaker – c.1993
Work on western deck stay cable guide pipe – c.1993
Kingshore scaffolding in place supporting pier table under western tower – c.1993
Placing concrete on western pier table – c.1993
Darrin Watson, concrete boom operator – c.1993
John Torrisi, concreter – c.1993
Joe Malacia, concreter – c.1993
John Baker signals to stop concrete supply on western pier table – c.1993
David Hardie, watching as foreman Trevor Weller directs work on western pier table – c.1993
Rod Collier and Bruce Cross manhandle stressing trumpet into position – c.1993
Heavy lift jacks in place on western approach span – c.1993
Ken Kaye-Smith guides cables into heavy lift jack – c.1993
Formtraveller is manoeuvred into position before lifting to western deck – c.1993
One of the first multi-strand stay cables in position – c.1993
Preparing reinforcing steel for concrete on western deck – c.1993
Concrete placing team on western deck – c.1993
Kofeinu Mataresi signals to pump controller for position of concrete placement – c.1993
Survey mark on deck – c.1993
Riggers working on Kingshore scaffolding – c.1994
Western tower from east – c.1994
Rigger on Kingshore scaffold – c.1994
Construction graphic 1 – c.1993
Construction graphic 2 – c.1993
Construction graphic 3 – c.1993
Construction detail 1 – c.1993
Construction detail 1 – c.1993
Construction detail 2 – c.1993
Construction graphic 4 – c.1993
Construction detail 3 – c.1993
Construction graphic 5 – c.1993
From the old Glebe Island Bridge on a winter morning. Western deck nears centre position – c.1994
The gap is closed on the segmented deck – c.1995
Eastern tower nearing completion – c.1994
Mark Taylor and Craig Scott on skidbeam with background of Kingshore scaffolding – c.1994
Formtraveller rising to eastern deck – c.1994
Formtraveller weighing 262 tonnes being raised by heavy lift jacks into position on eastern deck – c.1994
Dawn light on the eastern tower with scaffolding about to be moved – c.1994
Lowering formtraveller onto barges at completion of western deck main span – c.1994
Kingshore scaffolding ready to be moved by barge to eastern side of tower – c.1994
Eros Constandinos, boilermaker – c.1994
The western deck extends to central position of bridge 30 metres above the water – c.1994
Peter Cole hoists a load to western tower head – c.1994
Stack of ducting for post tensioning of deck – c.1994
Mario Da Conceicao, carpenter – c.1994
Astrubel Eusebio, leading hand carpenter – c.1994
Trevor Weller, foreman – c.1994
Tony Sutherland driving the Alimak hoist on western tower – c.1994
Steelfixer Richard Harris tying reinforcing bars in preparation for concrete placement – c.1994
Crane swings forklift truck off deck – c.1994
Western tower with mobile crane wheel – c.1994
Heavy duty cranes lower 42 metre long open box girder weighing 44 tonnes into position – c.1994
Safety screen fabric on stairway – c.1994
Placing concrete segment on eastern deck – c.1994
Steel detail – c.1995
Construction graphic – c.1995
Colour-coded outer stay cable sheaths – c.1995
General view onto western approach span – c.1995
Formtraveller is lowered onto barges after completition of western deck segments – c.1995
Spirit level and reimforcing rods – c.1995
Barney Kreft reaches guides a fascia panel into place – c.1995
Barney Kreft reaches out to guide a fascia panel rising towards tower head – c.1995
Galvanised steel maintenance gantry beams support brackets – c.1995
Tool box on deck – c.1995
Tubing used in concrete placement on deck slab – c.1995
Construction graphic – c.1995
Construction graphic – c.1995
Construction graphic – c.1995
Construction graphic – c.1995
Construction graphic – c.1995
Construction graphic – c.1995
Late sun illuminating western tower after passing storm – c.1995
Aluminium pedestrian barrier rail sections await placement and fixing – c.1995
A dancing couple under western tower – c.1995
The eastern tower head against the western face of the city – c.1995
People getting a low level view of western tower and cables from roadway – c.1995
Part of crowd of 65,000 who walked across the completed bridge on opening day – c.1995
Guests on approach deck at gala dinner the evening before the official opening – c.1995
Fireworks and floodlit towers at celebration dinner – c.1995
Lightning strike on Centerpoint Tower seen from Rozelle – c.1995
Glebe Island bridge with full moon – 1999
Recent Comments